7/31/2023 0 Comments Microsoft dynamics nav cost![]() ![]() When you choose “Implement the Cost Changes”, the system automatically creates a Revaluation Journal. We can see that when we rolled up the Standard Cost for Item 1000, the system also included the lower level subassemblies for the Bicycle:įigure 3 – Using the Standard Cost Worksheet The other way is to use the Standard Cost worksheet. ![]() Standard Cost options – Top Level and All Levels Standard Cost”, we get the options “Top Level” or “All Levels”:įigure 2 – Calc. In Dynamics NAV, we have two ways to roll up Standard Costs.įigure 1 – Rolling up Standard Costs from the Item Card When there are significant changes in the Production Process. ![]()